Earlier inspections showed that some minor clearance has arisen in the vertical direction between the foundation pile and the transition piece. End 2009 three monopiles were repaired, the remaining 33 piles are now repaired as well.

For this work, the ship was equipped with VOS Sympathy concrete silos and pumps.