The blades with a length of 45 metres are produced in Germany and transported by truck. This remarkable transport is done out of rush hour to diminish traffic problems. The blades arrive around midnight. At the location the blades are stored by three on a rack to be assembled later. The tower and turbines are transported by boat from Denmark. The installation of the towers and turbines will start in June.